AI translation
This page was translated from German with AI. If in doubt, the German original applies.
Annex VII (company role)¶
This guide shows the course of a shipment of green-listed waste under Article 18 of Regulation (EU) 2024/1157 — from the announcement by the arranger to the facility’s certificate of completed recovery.
Prerequisites:
- Logged-in access to ZEDAL — see Getting started.
- Every party involved has an identifier in the DiWaSS operator directory — see Roles.
- An understanding of the lifecycle, especially the sending procedure.
You do not need a notification: the procedure under Annex VII has neither a notification nor consent from the authorities. The arranger announces the shipment directly.
What this guide does not cover:
- The take-back (
SetAnnex7TakeBack), which the competent authority orders — see Take-back for what reaches you.
With the .NET SDK
The code for this guide is shown in Annex VII with the SDK.
What differs from the movement¶
- No notification procedure. The announcement is the first step; there is no file and no consent it refers to.
- DiWaSS assigns the number. The Annex VII number is created with the announcement; a number you send yourself is ignored. Each subsequent stage — takeover, certificates, completion — additionally receives its own number.
- One document for all stages. In ZEDAL, the announcement and all subsequent stages are stored in one document in the transport paper area. It is loaded by the Annex VII number.
- Facility or laboratory. The waste can be received by a recovery facility or a laboratory. There is no disposal in the procedure under Annex VII.
Actors per stage¶
Who triggers which stage follows from the parties in the announcement:
| Stage | Actor (role) | Follow-up intent | Note |
|---|---|---|---|
CreateAnnex7 |
Arranger | SubmitAnnex7Document |
At the latest two working days before the shipment starts |
SetAnnex7 |
Arranger | UpdateAnnex7Document |
Changes the announcement |
SetAnnex7CarrierTransfer |
Carrier | SubmitAnnex7CarrierTransferConfirmation |
Each carrier separately, under its own access |
SetAnnex7ConsigneeCertificate |
Consignee | SubmitAnnex7ConsigneeCertificateOfWasteReceipt |
Once per Annex VII |
SetAnnex7FacilityCertificate |
Facility or laboratory | SubmitAnnex7FacilityCertificateOfWasteReceipt |
One confirmation per facility |
SetAnnex7CertificateOfCompletion |
Recovery facility | SubmitAnnex7CertificateOfWasteCompletion |
One certificate per facility |
Cancellation (signal Annex7Cancelled) |
Arranger | — | Only in status ANNOUNCED |
SetAnnex7TakeBack |
Competent authority | SubmitAnnex7TakeBack |
Requires an authority context |
As with the movement, the follow-up intents apply to all parties. Which steps are yours only follows from matching them against your roles — see Lifecycle → Determining the state.
Stage 1 — CreateAnnex7¶
The arranger announces the shipment: parties, waste, quantity, planned start, recovery operation.
→ Implementation with the .NET SDK
Status after a successful push: ANNOUNCED. The Annex VII number is then contained in the response from DiWaSS, so it is only available after the document has been reloaded.
Subject to a time limit — two working days before the start
The arranger completes the form as far as possible at the latest two working days before the
shipment starts (Article 18(5) of Regulation (EU) 2024/1157). The quantity, the carrier and,
where applicable, the container number may be added at the latest before the start — with
SetAnnex7.
“Working day” means Monday to Friday, see Lifecycle → Time limits.
Roles in the announcement:
- Each party appears in the document with its identifier from the operator directory and a
PartyUUIDthat you assign to it. Declarations and the place of origin refer to the party via thePartyUUID, andcurrentUserPartyUUIDnames the party that sends. - If the arranger is also the producer, the arranger sets the indicator for this and does not enter a separate producer; the place of origin then refers to the arranger. If the same operator identifier appears twice in the document, DiWaSS rejects it with
DUPLICATE-OPERATOR-ID. - A carrier must not also be the arranger or the consignee.
What DiWaSS requires beyond the schema is described under Field rules → Annex VII.
Stage 2 — SetAnnex7¶
The arranger changes the announcement, for example to add the quantity or the carrier. The arranger addresses it by the Annex VII number.
→ Implementation with the .NET SDK
The status remains ANNOUNCED. Only the announcement can be changed: every call of a subsequent stage creates a new stage.
Stage 3 — SetAnnex7CarrierTransfer¶
The carrier confirms the takeover of the waste.
→ Implementation with the .NET SDK
The carrier states its contact with name, phone number and email; if one of the three is missing, DiWaSS rejects it with CARRIER-CONTACT-IS-REQUIRED.
Status after push: MOVING. With several carriers, each one confirms its takeover with a separate call under its own access; the status remains MOVING. If an access whose operator is not entered as a carrier in the document sends the stage, DiWaSS rejects it with INVOLVED-PARTY-MUST-EXIST-IN-DOCUMENT-CONTENT.
Stage 4 — SetAnnex7ConsigneeCertificate¶
The consignee confirms receipt of the waste.
→ Implementation with the .NET SDK
Status after push: RECEIVED.
Stage 5 — SetAnnex7FacilityCertificate¶
The facility or the laboratory confirms receipt.
→ Implementation with the .NET SDK
The status remains RECEIVED.
Subject to a time limit — two working days from receipt
The facility or the laboratory confirms receipt within two working days of receipt of the waste (Article 18(8) of Regulation (EU) 2024/1157).
Several facilities: first all receipts, then the completions
If the announcement lists several facilities, all of them first confirm their receipt. Only then
do the completions follow. DiWaSS rejects a completion that is sent before another facility has
confirmed its receipt with INSUFFICIENT-USER-PERMISSIONS.
Stage 6 — SetAnnex7CertificateOfCompletion¶
The recovery facility certifies the completion of the recovery. Stage 6 marks the end of the regular course.
→ Implementation with the .NET SDK
Status after push: COMPLETED.
Subject to a time limit — and the time limit is not anchored to acceptance
The recovery facility issues the certificate as soon as possible, at the latest 30 days after completion of the recovery and no later than one year after receipt of the waste (Article 18(9) of Regulation (EU) 2024/1157).
Canceling¶
As long as the shipment is only announced (status ANNOUNCED), the arranger can cancel it. To do so, the arranger sends the signal Annex7Cancelled. Status afterwards: CANCELLED, with no further steps.
The cancellation has no value of its own in DiwassIntents and therefore does not appear in FollowupIntents. A user interface that derives its buttons only from the follow-up intents never shows it.
Take-back¶
The take-back is ordered by the competent authority. The payload requires an authority context: the domain identifier of the authority and its signature. The status changes to TAKE_BACK; after that there are no further steps. A take-back is still possible after completion.
What’s next¶
- Lifecycle — states and stage order of Annex VII
- Roles — who may perform which stage
- Movement (Company) — the course in the notification procedure for comparison
- Error codes — what a rejection means